Monitoring Relays for Generators and ATS Systems
How phase-sequence, voltage/frequency and temperature monitoring relays let an ATS safely transfer a load onto a standby generator and back.
The TPCDIO11 is a Schneider Electric TransferPacT plug-in I/O module that accepts a constant (held, not pulsed) 24 V DC fire-protection signal. As long as the fire alarm system holds the signal, the module drives the transfer switch to the off position, isolating the load path for the duration of the fire condition.
| Range of product | TransferPacT |
|---|---|
| Product or component type | I/O module |
| Device application | Signalling |
| Auxiliary contact composition | 1 NO |
|---|---|
| Signalling function | Fire protection (transfer to off position) |
| Auxiliary connection terminal | Screw clamp terminal 0.05…2.6 mm² |
| Mounting mode | Plug-in |
| Mounting position | Left-bottom |
| Maximum input current | 10 mA 24 V DC +/- 20 % |
| [Ui] rated insulation voltage | 30 V DC |
| Tightening torque | 0.6 N.m +/- 0.1 N.m |
| Height | 56.5 mm |
| Width | 20 mm |
| Depth | 69 mm |
| Net weight | 40 g |
| Accessory / separate part category | Signalling accessory |
| IP degree of protection | IP20 |
|---|---|
| Pollution degree | 3 |
| Part number | TPCDIO11 |
|---|---|
| Brand | Schneider Electric |
| Condition | New, factory sealed |
| Source | Schneider Electric and its authorised distributors |
| Warranty | Manufacturer warranty |
| Lifecycle status | Active, in production |
| Warranty (in months) | 18 |
|---|
| Unit Type of Package 1 | PCE |
|---|---|
| Number of Units in Package 1 | 1 |
| Package 1 Height | 5.65 cm |
| Package 1 Width | 6.9 cm |
| Package 1 Length | 2 cm |
| Package 1 Weight | 140 g |
| Shipping weight | 0.04 kg |
| Ships from | Türkiye |
| Dispatch | — |
| Stock | On request |
Source: manufacturer data · Last verified: 30 Oct 2026
No documents are on file for this part yet.
Ask us for the datasheetThe tariff (HS) code on file for TPCDIO11 is 853890.
TPCDIO11 ships from Türkiye. Shipping calculated at checkout · import duties and taxes paid on arrival.
How phase-sequence, voltage/frequency and temperature monitoring relays let an ATS safely transfer a load onto a standby generator and back.